home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / pc / text / daily_2 / 930426.dfc < prev    next >
Text File  |  1993-04-29  |  8KB  |  184 lines

  1. "930426.DFC" (7551 bytes) was created on 04-26-93
  2.  
  3. 26-Apr-93 Daily File Collection
  4.    These files were added or updated between 25-Apr-93 at 21:00:00 {Central}
  5.                                          and 26-Apr-93 at 21:09:59.
  6.  
  7. =--=--=START=--=--= NASA Spacelink File Name:6_2_2_43_12_2.TXT
  8.  
  9. STS-55 Spacelab D-2 Mission    April 26, 1993
  10.  
  11. The space shuttle Columbia  lifted off at 9:50:00 a.m. CST into partly cloudy
  12. Florida skies.  Mission Control Status Reports are generally issued
  13. several hours after liftoff, and are usually updated on a 12 hour basis,
  14. depending on mission events.  We will be posting these updates as they are
  15. released.
  16.  
  17.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  18. =--=--=-END-=--=--=
  19.  
  20. =--=--=START=--=--= NASA Spacelink File Name:6_2_2_43_12_3.TXT
  21.  
  22. MISSION CONTROL CENTER STATUS #1
  23.  
  24. MISSION CONTROL CENTER
  25. STS-55 Status Report #1
  26.  
  27. Monday, April 26, 1993, 5:30 p.m. CDT
  28.  
  29.   Payload activities have started on board Columbia as the German Spacelab
  30. mission gets underway following a flawless launch and smooth laboratory
  31. activation.
  32.  
  33. Following the successful activation of the Spacelab module, Mission Specialist
  34. Jerry Ross and Payload Specialist Ulrich Walter have initiated the Biolabor
  35. experiments which study the effects of microgravity on a variety of biological
  36. specimen including small frogs and fish.  The Biolabor facility represents 16
  37. of the 88 experiments that make up the D-2 payload.
  38.  
  39. Columbia was launched from the Kennedy Space Center today at 9:50 a.m.  Central
  40. and since that time has been functioning without any major systems anomalies.
  41. Crew members, however, were required to switch to the backup orbiter
  42. refrigerator/freezer when the primary unit began warming up early in the flight
  43. because of a suspected blockage in that units freon system.  Astronauts
  44. switched to the backup unit which has been functioning as expected.
  45.  
  46. The freezer unit is needed to preserve the blood and urine samples for the life
  47. sciences experiments as well as some of the biological samples from Biolabor.
  48. Its normal operating temperature ranges between -21 and -23 degrees Centigrade.
  49.  
  50. The seven-member crew is divided into two teams for 24-hour payload operations
  51. for STS-55. The Red Team consisting of Mission Specialists Charlie Precourt and
  52. Bernard Harris and Payload Specialist Hans Schlegel began a six- hour sleep
  53. period shortly after Columbia arrived on orbit.  They will be awakened 7:20
  54. p.m.  Central and, after a short handover from the Blue Team, will begin their
  55. first full day of payload operations.  The Blue Team consisting of Commander
  56. Steve Nagel, Pilot Tom Henricks, Ross and Walter will begin their sleep period
  57. at 8:50 p.m.  Central.
  58.  
  59. Before the Red Team began their sleep period, Mission Manager Hauk Dodeck spoke
  60. to the crew from the German Operations Control Center and extended
  61. congratulations from German Chancellor Helmut Kohl.
  62.  
  63. Columbia currently is circling the Earth once every 90 minutes in a 163 by 161
  64. n.m. orbit.
  65.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  66. =--=--=-END-=--=--=
  67.  
  68. =--=--=START=--=--= NASA Spacelink File Name:6_2_2_43_7.TXT
  69.  
  70. STS-55 Keplerian Elements/State Vector
  71.  
  72. SPACELINK NOTE:  These are the predicted elements released by Gil Carman on
  73. 4/24/93.  This afternoon (4/26/93) he told us that because we had an on-time
  74. launch, these elements are correct to within 4 seconds.  He expects to issue
  75. updated elements on 4/25.
  76.  
  77. STS-55
  78. 1 00055U          93116.66861589  .00120200  00000-0  36300-3 0    79
  79. 2 00055  28.4697 268.5815 0003812 314.2100  45.8202 15.90487610    22
  80.  
  81. Satellite: STS-55
  82. Catalog number: 00055
  83. Epoch time:      93116.66861589   =    (26 APR 93   16:02:48.41 UTC)
  84. Element set:     JSC-007
  85. Inclination:       28.4697 deg
  86. RA of node:       268.5815 deg          Space Shuttle Flight STS-55
  87. Eccentricity:     .0003812             Prelaunch Keplerian Elements
  88. Arg of perigee:   314.2100 deg         Launch:  26 APR 93  14:50 UTC
  89. Mean anomaly:      45.8202 deg
  90. Mean motion:   15.90487610 rev/day              G. L. Carman
  91. Decay rate:     1.2020e-03 rev/day~2     NASA  Johnson Space Center
  92. Epoch rev:               2
  93.  
  94.  
  95.  
  96. STS-55
  97. FLIGHT DAY 1 STATE VECTOR (PREDICTED)
  98. ON ORBIT OPERATIONS
  99. (Posted 04/22/93 by Roger Simpson)
  100.  
  101. The following vector for the flight of STS-55 is provided by NASA Johnson
  102. Space Center, Flight Design and Dynamics Division for use in ground track
  103. plotting programs.  The vector represents the predictied trajectory of
  104. Columbia during on orbit operations, after the OMS-2 maneuver.  The vector
  105. assumes an on time launch.  Questions regarding these postings may be
  106. addressed to Roger Simpson, Mail Code DM4, L. B. J. Space Center, Houston,
  107. Texas 77058.
  108.  
  109.  
  110. Lift off Time : 1993/114/14:52:00.000
  111. Lift off Date : 04/24/93
  112.  
  113. Vector Time (GMT) : 114/15:35:00.000
  114. Vector Time (MET) : 000/00:43:00.000
  115. Orbit Count : 1
  116. Weight : 244237.0 LBS
  117. Drag Coefficient : 2.00
  118. Drag Area : 2750.0 SQ FT
  119.  
  120.      M50 Elements                           Keplerian Elements
  121. -----------------------                 --------------------------
  122. X    =   -16316639.1  FT                A          = 3608.0505 NM
  123. Y    =    11463512.2  FT                E          = 0.000522
  124. Z    =    -9082446.2  FT                I  (M50)   =  28.21573 DEG
  125. Xdot = -11959.988763  FT/S              Wp (M50)   = 258.26527 DEG
  126. Ydot = -21597.692493  FT/S              RAAN (M50) = 266.81945 DEG
  127. Zdot =  -5764.287807  FT/S            / N (True)   = 342.98133 DEG
  128.                            Anomalies  \ M (Mean)   = 342.99882 DEG
  129.  
  130.                                         Ha         = 162.4037  NM
  131.                                         Hp         = 160.0044  NM
  132.  
  133. Mean of 1950 (M50)   : Inertial, right-handed Cartesian system whose
  134. Coordinate System      origin is the center of the earth.  The epoch
  135.                        is the beginning of the Besselian year 1950.
  136.                        X axis: Mean vernal equinox of epoch
  137.                        Z axis: Earth's mean rotational axis of epoch
  138.                        Y axis: Completes right-hand system
  139. A:    Semi-major axis
  140. E:    Eccentricity                         N:    True anomaly
  141. I:    Inclination                          M:    Mean anomaly
  142. Wp:   Argument of perigee                  Ha:   Height of apogee
  143. RAAN: Right ascension of ascending node    Hp:   Height of perigee
  144.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  145. =--=--=-END-=--=--=
  146.  
  147. =--=--=START=--=--= NASA Spacelink File Name:6_2_2_43_8.TXT
  148.  
  149.  NOTE: This file is too large {22036 bytes} for inclusion in this collection.
  150.     The first line of the file:
  151.  
  152. STS-55 TV SKED REV
  153. STS-55 TV SKED D
  154.  
  155.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  156. =--=--=-END-=--=--=
  157.  
  158. =--=--=START=--=--= NASA Spacelink File Name:6_2_2_44_12_2.TXT
  159.  
  160. STS-56 ATLAS 2 Mission       April 8, 1993
  161.  
  162. The space shuttle Discovery lifted off at 12:29 a.m. CDT into clear
  163. Florida skies.  Mission Control Status Reports are generally issued
  164. several hours after liftoff, and are usually updated on a 12 hour basis,
  165. depending on mission events.  We will be posting these updates as they are
  166. released.
  167.  
  168.  
  169.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  170. =--=--=-END-=--=--=
  171.  
  172. =--=--=START=--=--= NASA Spacelink File Name:8_3.TXT
  173.  
  174.  NOTE: This file is too large {17716 bytes} for inclusion in this collection.
  175.     The first line of the file:
  176.  
  177. NASA TEACHER RESOURCE CENTER TRCN NETWORK
  178.  
  179.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  180. =--=--=-END-=--=--=
  181.  
  182. =--=END OF COLLECTION---COLLECTED 6 FILES---COMPLETED 22:11:28=--=
  183.  
  184.